December Campus Update: Hoisting Steel Truss
Crews get ready to lift 32m-long 6.5t steel truss into place atop the South Building.
Campus Construction Update: Dec 4
Mid-December site view.
Steel framework for the pool area complete, framing of the South Building continues.
View of the eventual HUB space area in the North Building.
Head of School Craig Coutts walks along the “street” in between the North and South buildings.
View into the elementary open hub. The two-story-high space will be covered by a massive skylight.
Craig Coutts with other board members in the elementary classroom area on a recent site visit.
Music rooms in the North Building under construction.
Autumnal colors of the pedestrian and bicycle path can be seen outside the entrance to the performing arts wing.
Taisei Corp. construction manager Watanabe-san guided YIS board directors on a recent tour of the site.
Construction work continues into the dark evening hours.
Preliminary furnishing plan for elementary classroom.